Buddy Lab · Field Map · 2026-06-24 · generated from status.yaml
The trail to the north star
Where we started, where we stand, and the climb still ahead — read against the one constraint that never gets crossed off: a live, hosted, multi-family product real households actually use.
The trail — milestones
Single-file generator, hand-run
Three-account hardened infra
Basecamp dashboard live
Infra wall healed — runtime runs as agent
Ratings → grounding loop
Slice 2a — weather-drift + surgical refresh
Slice 2b-1 — morning cron self-fires
Phase 1 drained + triage complete
Decision point — route ratified (autonomy ladder)
Stage-2 verification floor — judge + char-suite + fail-closed
Weekly superintendent review — deterministic facts + LLM prose
You are here
The route is ratified and the Stage-2 verification floor is live — an LLM judge (advisory, calibrating toward blocking), a character suite, and fail-closed safety gates now stand between the generator and a child. The active climb is the autonomy drain: earning the judge's promotion on measured agreement and making the lab's own views self-maintaining. Delivery and the multi-family leap are the named gaps ahead, each held behind a deliberate gate.
Slice 2b-3 — day-roll + calibration
Email-PDF delivery
Live, hosted, multi-family product
Operating system for autonomous app development
Trail conditions — capability maturity
| Capability | Prototype | Hardened | Autonomous | Multi‑tenant |
|---|---|---|---|---|
| Infrastructure | ||||
| Orchestration | ||||
| Grounding | ||||
| Delivery | ||||
| Generation | ||||
| Multi-family |
(achieved + ½‑frontier ÷ 24 cells · 11.0/24) single-tenant track ≈ 60% · multi-tenant column = the gap
Revision log · 2026-06-24 · regenerated from status.yaml
- 2026-06-24 · regenerated from canonical status.yaml. Climb-strip advanced: decision node resolved (route ratified); Stage-2 verification floor and weekly superintendent review added as shipped milestones; autonomy drain is the current you-are-here. Maturity grid: generation hardened (prototype now solid). North-star % recomputed from the grid. This map is now generated by render_fieldmap.py — status.yaml is canonical, the HTML is output.
Fidelity A (timeline) + B (maturity grid) — this map.
Fidelity C — illustrated trail map, milestones as markers, pinnacle as summit — scoped separately next session.
Stages and placements reflect single-tenant reality; the multi-tenant column is the north-star gap, intentionally empty.